Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.11765/8890
CEOS Intercalibration of Ground-Based Spectrometers and Lidars: First Progress Report
Title: CEOS Intercalibration of Ground-Based Spectrometers and Lidars: First Progress Report
Authors: Roozendael, Michel VanKöhler, UlfPappalardo, GelsominaKyrö, EskoRedondas, Alberto ORCID RESEARCHERID Autor AEMET
Keywords: Ozone spectrophotometers; Brewer spectrophotometers; Dobson spectrophotometers; Ozone measurements; Calibration
Issue Date: Feb-2011
Publisher: Committee on Earth Observation Satellites
Abstract: This document reports on activities and achievements obtained during the first part of the ESA CEOS Intercalibration project. The period covered extends from March 2009 until December 2009.This document is the first progress report of the CEOS Intercalibration of Ground-Based Spectrometers and Lidars project. It summarizes activities performed and results achieved within each team.
URI: http://hdl.handle.net/20.500.11765/8890
Appears in Collections:Estudios / Informes


Files in This Item:
  File Description SizeFormat 
CEOS-InterCal_PR01_Sc...
1,47 MBAdobe PDFThumbnail
View/Open
Show full item record



Items in Arcimis are protected by Creative Commons License, unless otherwise indicated.

Arcimis Repository
Nota Legal Contacto y sugerencias