Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.11765/8890
CEOS Intercalibration of Ground-Based Spectrometers and Lidars: First Progress Report
Title: | CEOS Intercalibration of Ground-Based Spectrometers and Lidars: First Progress Report |
Authors: | Roozendael, Michel Van; Köhler, Ulf; Pappalardo, Gelsomina; Kyrö, Esko; Redondas, Alberto
![]() ![]() ![]() |
Keywords: | Ozone spectrophotometers; Brewer spectrophotometers; Dobson spectrophotometers; Ozone measurements; Calibration |
Issue Date: | Feb-2011 |
Publisher: | Committee on Earth Observation Satellites |
Abstract: | This document reports on activities and achievements obtained during the first part of the ESA CEOS Intercalibration project. The period covered extends from March 2009 until December 2009.This document is the first progress report of the CEOS Intercalibration of Ground-Based Spectrometers and Lidars project. It summarizes activities performed and results achieved within each team. |
URI: | http://hdl.handle.net/20.500.11765/8890 |
Appears in Collections: | Estudios / Informes |
Files in This Item:
File | Description | Size | Format | ||
---|---|---|---|---|---|
![]() | CEOS-InterCal_PR01_Sc... | 1,47 MB | Adobe PDF | ![]() View/Open |
Items in Arcimis are protected by Creative Commons License, unless otherwise indicated.
